The M39 project is a modern center project located directly above the county building and the state roads. The roof is sunny with a nice view of the river and the mountains. Foundations and banquets are carried out in reinforced concrete structures adapted to the urban conditions. The main support system is performed as prefabricated concrete / steel constructions / hole decks. Floor slabs are made of concrete / hole decks.
Peikko's DELTABEAM® enabled the slim floor structures and its fast installation speeded up the construction process.